bannet 05
Manton office building smart power solutions
2023-07-07 13:56

Traditional office building power distribution solution [Pain point]

The program lacks "wisdom" (ignition, load, three-phase balance, etc., cannot be monitored); "Complex" (adding a variety of devices), "only monitor but not control" (some scenarios cannot be remotely processed), "limited scenarios" (cannot meet the different requirements of different devices on voltage, current, load, etc.).

Manton office building intelligent power solutions 

(一)Overview of the Manton scheme

The highly integrated intelligent micro-break/plastic shell, and the cloud platform behind it, can directly carry out multi-level and multi-scene monitoring or monitoring online, in addition to electricians, the person in charge of office buildings at all levels, the group and the government fire department can know the safety situation of electricity immediately and at any time.

High power management efficiency, no dead corners, fine, the platform and APP can directly monitor each device's various power data, leakage, ignition, overload, over and under voltage and so on; If the switch is not performed within the specified period or the threshold is exceeded, the alarm is generated and the switch can be performed remotely.

It can flexibly adjust the power consumption plan at any time according to the needs, and it is free to rewind and release, and it is easy to transform and add equipment.

The solution is simple, the equipment integration is high, and the construction and maintenance difficulty is small. According to the budget, key objects and scenarios, different intelligent circuit breakers can be selected.

(二)Manton scheme design

6374448324674850002827031.png


(三)Manton program highlights

Match various application scenarios to improve comfortSafety monitoring (temperature, short circuit, leakage); Voltage and current stability monitoring (over and under voltage, over and under current, three-phase unbalance); Equipment active power monitoring; Load monitoring; Scenarios such as remote switching and closing.

Simple deployment and low implementation cost:There is no need to add "residual current transformer" and "temperature sensor" at the back end of the meter, and the highly integrated single device has low installation space requirements and small construction difficulty.

Maintenance and use is simple and straightforward:Maintenance positioning is simple and fast; The system automatically performs inspection. Reduce the workload of electricians and reduce professional level requirements.

High safety, alarm real-time automatic fire report:The on-off function not only ensures the short circuit, but also ensures the automatic handling of safety alarms such as over-temperature, ignition, over-current, over-voltage and leakage.

High reliability, excellent product quality:High acquisition accuracy; Remote control function, find problem processing speed is exponentially improved; Different data return modes can be used according to the site environment; Equipment integration should be high, a single device can complete all intelligent functions, improve equipment reliability.


News
×
400-826-0688